These are a few of our recent projects:
Econ Trail 42” Force Main Bypass – This
was the first 42” PVC job in the State of Florida. The job
contained two 36” wet taps on pressure concrete pipe with
increasers to 42” PVC. A laying schedule had to be created
by the project management team to procure the materials
which were special made for this project.
City
of Dunnellon Waste Water Project Phase 2 – This project
was constructed during the year 2007 which included
installing sewer system in the heart of Dunnellon. This
project included 3 new lift stations and 49 grinder pump
stations, 17,000 LF of force main, 26,000 LF of gravity
sewer main and the demolition of 140 septic tanks.
City of Keystone Heights Sewer System – This
project was constructed to provide City wide sewer services
which included collection and transmission to a new sewer
plant. It included 13,000 LF of Force Main; 8 jack and bore
crossings; 5 new lift stations; 19,000 LF of gravity main.
Gator in the pipe – This picture is one of our more unique experiences. Our men had to plug the pipe to stop the water flow due to storm structure modification and were quite surprised to find this big gator staring at them.