These are a few of our recent projects:

Econ Trail 42” Force Main Bypass – This was the first 42” PVC job in the State of Florida. The job contained two 36” wet taps on pressure concrete pipe with increasers to 42” PVC. A laying schedule had to be created by the project management team to procure the materials which were special made for this project.
job name job name job name job name job name job name job name

City of Dunnellon Waste Water Project Phase 2 – This project was constructed during the year 2007 which included installing sewer system in the heart of Dunnellon. This project included 3 new lift stations and 49 grinder pump stations, 17,000 LF of force main, 26,000 LF of gravity sewer main and the demolition of 140 septic tanks.
job name job name job name job name

 

City of Keystone Heights Sewer System – This project was constructed to provide City wide sewer services which included collection and transmission to a new sewer plant. It included 13,000 LF of Force Main; 8 jack and bore crossings; 5 new lift stations; 19,000 LF of gravity main.
job name job name job name


job name
Gator in the pipe
– This picture is one of our more unique experiences. Our men had to plug the pipe to stop the water flow due to storm structure modification and were quite surprised to find this big gator staring at them.